Permitted development rights, explained properly
What you can build without planning permission, what the limits actually are, and the traps that catch people out.
The rule nobody explains properly
Permitted development is a national grant of planning permission. It already exists. You do not apply for it, you simply fall inside it or you do not. That is the whole idea, and it is why the question is never "will they let me" but "am I inside the box".
The box, for a house
- Rear depth. Three metres for a terraced or semi detached house, four for a detached one.
- The larger scheme. Six and eight metres respectively, but only with prior approval and a neighbour consultation.
- Height. Four metres maximum for a single storey rear extension. Three metres at the eaves if you are within two metres of a boundary.
- Roof volume. Forty cubic metres for a terraced house, fifty for a semi or detached. Any previous roof enlargement counts against it.
- Garden coverage. You cannot cover more than half the land around the original house.
Where the rights disappear entirely
Flats and maisonettes have none. Conservation areas lose roof extensions completely and lose the larger rear extension route. And an Article 4 direction can remove the lot, which is common across inner London and increasingly used elsewhere.
The trap that catches people
"Original house" means as it stood in 1948, or as first built if later. A previous owner's extension eats your allowance. So does a conversion you never knew about. This is the single most common reason a project that looked compliant turns out not to be.
Does this apply to your house?
Reading the rules is one thing. The Project Calculator applies them to your house and shows you the answer as a drawing, with the cost alongside.
Open the Project Calculator 60 secondsMore guides
GuideHow long does planning permission actually take?
The statutory eight weeks, what really happens, and where the time goes on a householder application.
Read it →
GuideYour planning application was refused. What now?
Why householder applications get refused, whether to appeal or resubmit, and how long each route takes.
Read it →
GuideArticle 4 directions, and why they matter to you
How councils remove permitted development rights, how to find out if yours is affected, and what it changes.
Read it →
GuideParty wall agreements without the jargon
When you need one, what it costs, how long it takes, and what happens if your neighbour objects.
Read it →
GuideBuilding regulations and planning permission are not the same thing
Two separate approvals, two separate risks. What each one covers and why passing one does not help with the other.
Read it →Twenty minutes with the team that sweats the details.
No obligation, no script. An honest read on what your house can do, from people who obsess over getting it approved.
- Twenty minutes, by phone or video, whenever suits
- Anywhere in the UK, whatever your council
- You leave knowing what is possible, and roughly what it costs
Book your free call
Tell us where to reach you and we will confirm a time.
We confirm by email within one working day. No sales calls, ever. How we use your details.
That is booked in.
We will email you within one working day with a time.
What can I help with?
Planning permission, permitted development, what things cost, or what your council actually approves.
Guidance, not a lawful development certificate. For your house, use the Project Calculator.