Cost guide · Updated 2026

How much does a rear extension cost?

The most common project in the UK. Price is driven by depth, glazing and whether the kitchen moves.

£42,000£95,000

These are Extnd estimates built from recent UK project costs, not official statistics. Treat them as a planning range rather than a quote.

Axonometric drawing of a single storey rear extension, with the proposed work picked out in green
Single storey rear extension, drawn in green against the existing house

Where the money actually goes

Based on a £62,000 project. The proportions hold reasonably well across the range, which is useful when you are sanity checking a quote.

Line itemTypical costShare
Design, drawings and planning£6,20010%
Structural engineering£2,4804%
Groundwork and foundations£9,92016%
Structure, walls and roof£14,88024%
Glazing and external doors£7,44012%
Roofing and weatherproofing£4,3407%
First fix, electrics and plumbing£5,5809%
Plaster, floors and decoration£6,82011%
Building control and fees£1,8603%
Contingency£2,4804%

What moves this number

  • Drainage. If a soil stack or manhole sits where you want to build, budget several thousand before anything else happens.
  • Structural openings. Wide steels need bigger foundations at both ends. A five metre opening is not twice the price of a two and a half metre one.
  • Glazing. The single biggest lever. Standard doors to slim framed sliders can be a fifteen thousand pound swing.
  • Ground conditions. Clay, trees nearby or a high water table all push foundations deeper.
  • Where you are. London and the South East run roughly twenty to thirty per cent above the national average on labour.
Project Calculator

Get your cost in 60 seconds.

Every project is different. The Project Calculator prices your actual footprint, spec and region, and tells you whether it needs planning at the same time.

Open the Project Calculator 60 seconds

Questions people ask before they commit

How much does a single storey rear extension cost in 2026?

Most projects land between £42,000 and £95,000, with the middle of the market around £62,000. The spread is wide because specification moves the number far more than size does. Two identical footprints can differ by thirty thousand pounds on glazing and finishes alone.

How long does a single storey rear extension take?

Allow 12 to 18 weeks on site once work begins. Before that, design and planning typically take eight to sixteen weeks depending on whether you need permission. The build is the predictable part. The approvals are where projects slip.

Do I need planning permission for a single storey rear extension?

Often not. Many of these fall under permitted development, which means no application at all, provided you stay within the size limits and are not in a conservation area or covered by an Article 4 direction. The Project Calculator will tell you which side of the line you are on in about a minute.

What makes the price go up the most?

Three things, in order. Moving drainage or a soil stack. Structural openings that need steel, particularly wide ones. And glazing, where the jump from standard doors to a slim framed sliding system can add fifteen thousand pounds on its own. Size is a surprisingly small factor by comparison.

Is it cheaper to extend or to move?

Extending almost always wins on pure cost. Stamp duty, agent fees, legal costs and removals on a typical UK move comfortably exceed the cost of a well judged extension, and you keep the house, the street and the school catchment. The exception is when the house cannot take what you need.

Start anywhere

Twenty minutes with the team that sweats the details.

No obligation, no script. An honest read on what your house can do, from people who obsess over getting it approved.

  • Twenty minutes, by phone or video, whenever suits
  • Anywhere in the UK, whatever your council
  • You leave knowing what is possible, and roughly what it costs

Book your free call

Tell us where to reach you and we will confirm a time.

What are you thinking of?

We confirm by email within one working day. No sales calls, ever. How we use your details.

That is booked in.

We will email you within one working day with a time.